Exhibit Loading Access: East Hall: south slope:8 M×4M, platform:3M×4M;
WestⅠ, WestⅡand West Ⅲ: Slope A: 5.3M×4.3M,Slope B: 4M×7M,West Unload Platform: 8.05M×6M,South A Unload Platform: 5.4M×6M,South B Unload Platform: 4.25M×6M,
Elevator: WestⅠ, WestⅡand West Ⅲ:1.35 tons elevator for goods×2,
4# 3 tons elevator for goods,capacity:2.5M(W)×3.54M(L)×2.44M(H),gate size:2M(W)×2.4M(H)
5#7# 5 tons elevator for goods,capacity:2.5M(W)×3.54M(L)×2.44M(H),gate size:2 M(W)×2.4M(H)
6# 5 tons elevator for goods,capacity:3.8M(W)×3.0M(L)×5.0M(H)
8# 5 tons elevator for goods,capacity:4M(W)×6.5M(L)×3.3M(H)
2 elevators between WestⅠand WestⅡ; 2 elevators between WestⅡ and WestⅢ
Power Supply: 380V / 220V,2500W
Compressed Air: Portable 6-8bar,Various Outlets at 10 mm, 19 mm, 25 mm.
Water Supply: EastⅠ, 25mm outlet×3; WestⅠ, 15mm drainage outlet×21; 50mm outlet×8; WestⅡ, 15mm outlet×29; WestⅢ, 15mm outlet×20.
Drainage: East I, water enter into open pool; WestⅠ, 100mm outlet×10; WestⅡ and WestⅢ, 75mm outlet×10 in each hall.
Internet: Cable Broadband Network (Max Individual: 10M).
Fire Protection: Automatic Fire Sprinkler, Detection & Alarm System with Riser & Hosereel, Portable Fire Extinguishers, Hydrant.
* Any exhibit exceeding floor loading limits will have to submit written application with floor plan to official freight forwarder of “SNEC(2009)PV POWER EXPO” before April 20, 2009. The moving in of such exhibits must be approved in advance.
3. Rules and Regulations on Construction and Dismantling
3.1. Construction and dismantling should be instructed by the Service Department.
3.2. Contractors will have to wear name badges provided by the Organizing Committee throughout the construction and dismantling periods. Exhibitors can also enter the exhibition hall upon the Exhibitor Badge during the construction and dismantling periods.
3.3. Exhibitors are required to inform Service Department of any overtime work before 15:00 each day during stand construction time. Overdue payment will be charged a 50% penalty fee.
3.4. Any exhibitor’s space containing more than 3 standard booths (≥27M2) must be installed in open-design. To change the standard booth installation (remove the walls of the 2 neighboring standard booths), please send application to Service Department” before April 20, 2008.
|