Chinese English Japanese
 
·Approved by·
Ministry of Science and Technology of the People’s Republic of China      No.0527(2008)

· Initiated and Organized by ·
Shanghai New Energy Industry Association

·Organized by·
European Photovoltaic Industry Association
New Energy Industry Association for Asia and the Pacific
Chinese Renewable Energy Society
Chinese Renewable Energy Industries Association
American Council On Renewable Energy
Solar Energy Industries Association
Japan Photovoltaic Energy Association
German Solar Industry Association
Delegation of German Industry & Commerce Shanghai/econet china Deutsche Gesellschaft für Technische Zusammenarbeit GmbH
Taiwan Photovoltaic Industry Association
International Photovoltaic Equipment Association
Shanghai Federation of Industrial Economics
Shanghai Science Technology Development & Exchange Center
·Supported by·
Science and Technology Commission of Shanghai Municipality Shanghai Municipal Development & Reform Commission
Shanghai Economic Commission
·Managed by·
Shanghai Environmental Science Information Technology Exchange Center
Follow Me Int’l Exhibition (Shanghai), Inc.

Follow Me Int’l Exhibition (USA), Inc.



·Load-bearing capacity
    Ceiling Strength:The load-bearing capacity of the upper storey when used for general visitor traffic, meetings, presentations and/or as storage space must be a minimum of 5 kN/sqm, in accordance with the regulations concerned, insofar as a capacity reduced to 2 kN/sqm is permissible under the following conditions: The upper storey is used as private office, salesroom (less than 50 sqm in area), lounge or hallway. People only stay here for limited periods. The stairways must be closed to the general public with corresponding visible signs. The designated use of such rooms must be clearly indicated in the planning documents submitted.
    Strength of Stairways: The construction must be capable of resisting 1/20 of the load-bearing capacity in horizontal direction (point of attack: surface of upper floor). All stairways are to be constructed in accordance with Shanghai Building Regulations and with a load-bearing capacity of 5 kN/sqm.
    Strength of Fence / Handrail:Fence and handrail must be designed to withstand horizontal loads of 1 kN/m at the level of the handrail. Proof must be provided that the pressure applied by the supports does not exceed the maximum permissible pressure the hall floor can withstand.

·Fire prevention:
    The maximum length of any escape route from the upper floor to the aisle is 25 meters.
    On stands with upper storey of 100 sqm in area or less, one stairway is required, which must be outside the covered area of the stand.
    On stand with an upper storey more then 100 sqm in area, at least two stairways are required, at     opposite ends of the stand, one of which must be outside the covered area of the stand.
    The space beneath and alongside open-tread stairways must not be used for storage, nor for the installation of shelves.
    If the area covered by the upper storey exceeds 30 sqm, a sprinkler system must be installed in accordance with the regulations, with one sprinkler unit to be installed every 12sqm or part thereof of covered space. All rooms must be incorporated within the sprinkler system.
    No area of the upper storey may have a closed ceiling or canopy. Metal grids 1 cm x 1 cm in modular dimension are permitted. Including lighting elements, the open area must comprise at least 80 %. All cabins and enclosed areas must permit clear sight of the outer exhibition hall. Up until final approval of the completed stand, additional measures of safety or fire prevention may also be imposed if necessary.

Form—Building Approval for Two-story Stand Design Deadline: March 30, 2008 -Submit in duplicate-


Fill in this form and send it by FAX
Shanghai Follow Me Exhibition Co., Ltd.
Add: Room1009, No.1525, West Zhongshan Rd., 200235, Shanghai, China
Contact Person: Shirley Chen
Tel: 0086-21-64380781
Fax:0086-21-64642653
E-mail:office@sneia.org
Website:http://www.snec.org.cn

 

Company:

Address:

Tel:

Fax:

Email:

Authorized by:

Signature:

Date:

Hall No.:

Booth No.:

>> Exhibition Procedure Walk-through
>> Order Forms Checklist
>> Rules and Regulations
>> Security Liability (for Raw Space Exhibitors)
>> Regulation on the Size of Exhibits and Structural Materials
>> Penalty Regulation on On-site Illegal Electricity Usage
>> Notice 1
>> Regulations on the Booth Construction
>> Notice 2
>> Outdoor Stand and Two-storey Stand Construction
>> Official Service Partners
>> Badges Ordering
>> Move-in and Move-out of Exhibits
>> Information for Exhibitors Who Reserved Raw Spaces Only
>> Registration of Booth Contractor
>> Additional Furniture/Facility Renting
>> Electricity, Air Compressor, Water and Telephone Renting
>> Official Freight Forwarders
>> Security
>> Business Reception
>> CUDC Customer Data Collector Renting
>> Hotel Booking
>> Train & Rail Tickets Booking
>> Other Services Application
>> Catalogue Entry
>> Advertising Options and Application
>> Enterprise Workshop Application
>> Meeting Room and Additional Facility Renting
>> Quotation for Meeting Rooms
>> Invitation Letter to Customers
>> Exhibits Registration
>> The Appointed Account
>> Map
>> Exhibitor Manual Download
[ First page--Previous--Next page-- End page ]
QQ Communicating Room for Domestic Cooperation Dept:68601134         QQ Communicating Room for International Cooperation Dept68664059       
 
QQ Communicating Room for Conference Committee70737548
Contact Us Overview Appointed Account Link Advertisement Cooperation Organization Committee Secretariat

Add: Room 1008, No.1525, West Zhongshan Rd., Shanghai, China.
Tel: +86-21-64380781/+86-21-64276991/64279573      Fax: +86-21-64642653      E-mail:office@sneia.org
Webwww.snec.org.cn